GE SITEPRO PDF

Uninterruptible Power supply. Digital Energy™. SitePro. 10 – 15 – 20 – 30 – 40 kVA. Vac CE / Series 8. GE Consumer & Industrial SA. SitePro, the most reliable Uninterruptible Power System available for data security and other demanding critical applications. GE Consumer & Industrial. Power Protection. Digital Energy™. SitePro. ®. Series UPS. Uninterruptible Power Supply 10 – kVA. GE imagination at work.

Author: Guzilkree Brami
Country: Guyana
Language: English (Spanish)
Genre: Finance
Published (Last): 26 March 2004
Pages: 371
PDF File Size: 5.18 Mb
ePub File Size: 5.34 Mb
ISBN: 331-7-46801-127-7
Downloads: 94784
Price: Free* [*Free Regsitration Required]
Uploader: Gusida

The UPS system and the critical load have to be completely powered down. The LCD will display a series of screens containing the user parameters, accessible without password protection. Check for correct phase rotation — As for the single version. Rectifiers Paralleled On The Same Battery A parallel system with a Common Battery for two or more UPS, requires a particular installation and adequate setting of some parameters, accessible only through passwordand can therefore only be done by a qualified GE engineer.

All SitePro UPS models operate in double conversion mode providing true on-line operation and are fully compliant with international standards regarding VFI operation. Never close or open either Q1 or Q2 with the inverter running.

The information displayed includes: This symbol refers to the operations of a parallel system. N p a ra m e te rs Tel1 This parameter specifies a first telephone number to be used for modem dial-out. Now the control panel should indicate a normal situation No alarms.

Enter text from picture: Control Bus Cable Location 4. Don’t have an account?

GE DIGITAL ENERGY SITEPRO VAC CESERIES 7 OPERATING MANUAL Pdf Download.

A parallel system with a Common Battery for two or more UPS, requires a particular installation and adequate setting of some parameters, accessible only through passwordand can therefore only be done by a qualified GE engineer.

  BELDEN 8218 PDF

The meaning of the user parameters and their use is described below buttons performance is described to Section 7. When one UPS needs maintenance or service, the Load is powered by the other units.

The reliability of the system depends on this contact NC Normally Closed! The control bus connection between parallel units must be made on the front of the electronic module fitted behind the front door Fig.

Osborne Park WA The events displayed are the standard GE events as described in the Section 7. Page 38 General alarm condition It blinks when one or more alarm is activated.

Miscellaneous screen This screen displays: For parallel systems, the delivery also includes the bus control cables for inter- connecting the UPS modules. The redundant communication bus to which all units are connected keeps each unit informed about the status of all the other units.

Weekday – Saturday – Sunday – Monday – Tuesday Inverter output fuses blown F5, F6, F7. The non-observance of the warnings reminding hazardous situations could result in human injury and equipment damages.

Cooling air enters the cabinets through the air inlet grids located at the bottom and exhausted through the outlet on the roof. Top Cable Entry Box The UPS cabinet is free standing and normally does not require bolting to the floor.

SitePro® UPS & kVA (CE listed) – Presentations

These steps are not applicable for single units. A high temperature of the UPS room and of the battery room affect the lifetime of several components inside the equipment. An equivalent set of parameters for Example 4 is. Battery Location The UPS cabinet is free standing and normally does not require bolting to the floor.

  HEP20 TECHNICAL HANDBOOK PDF

Page 68 Page 69 – Start-up an additional unit in a redunda RX in Pin 5: If optional cabinets and accessories are included with the UPS, please refer to those accompanying manuals for installation and operating instructions. To lift the cabinets, use a forklift or lifting belts with spreader bars.

May be reset by a service technician only. Open the front door and make sure that: Individual inverters, which are not required to sustain the load, can automatically be switched off.

Output Signals On Voltage-free Contacts sihepro. Options In Additional Cabinets Gen Set Signalling gen On 9. Shut Down Procedures This symbol refers to the operations of a parallel system. This is the only printer-interface supported by the UPS. Due to the limitation of the number of characters the viewing of various screens is implemented by scrolling.

Digital Energy™ SitePro® UPS 10-500 kVA

It is important to have a clean, sktepro place provided with proper ventilation or air-conditioning to keep the ambient within the specified operating range. SitePro UPS provides reliable and robust protection for mission critical installations between IT and telecommunications, and infrastructure applications such as airports, hospitals, and financial companies. Before doing the following operations, make sure that you have shut down all equipment, which is normally powered by the UPS.

Page 66 For parallel systems perform the following procedure on each unit, starting from unit no. Sitepo that the output load distribution can be powered and all the output isolators are open. The load is powered by the UPS redundant parallel system.